Bid Solicitation: S-KP0674-00006487
|
Responses Due in 15 Days, 20 Hours, 36 Minutes
|
Header Information
|
Bid Number:
|
S-KP0674-00006487
|
Description:
|
Sewer Collection Grout and Repairs
|
Bid Opening Date:
|
04/27/2023 02:00:00 PM
|
Purchaser:
|
Stephanie Patterson
|
Organization:
|
City of Powers
|
Department:
|
KP067401 - Administration
|
Location:
|
001 - Administration
|
Fiscal Year:
|
23
|
Type Code:
|
|
Allow Electronic Quote:
|
Yes
|
Alternate Id:
|
|
Required Date:
|
04/27/2023
|
Available Date
:
|
04/11/2023 09:00:00 AM
|
Info Contact:
|
Loree Pryce, PE email: lpryce.ess@gmail.com
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
A Non-Mandatory Pre- Bid will be April 18, 2023 at 1:00 PM on zoom. Contractors may visit the site however the meeting will be held virtually. A recording of the prebid will be made available upon request.
|
Bulletin Desc:
|
Furnishing all labor, equipment, materials and supervision for a citywide sewer collection system rehabilitation and inflow and infiltration reduction project. Efforts shall include several types of non-excavation rehabilitation, environmentally friendly techniques to obtain a I/I reduction goal of 75% from current peak wet weather flows. The work will include grouting, rehabilitation and repair techniques including; UV cured CIPP lining, chemical point repair grouting,T-liner, manhole rehab
|
|
Ship-to Address:
|
|
Bill-to Address:
|
|
File Attachments:
|
Advertisement
|
Form Attachments:
|
|
Required Quote Attachments
|
|
Discipline Type:
|
Public Improvement
|
Procurement Method:
|
Competitive Sealed Bid
|
|
Item # 1:
(
578
-
97
)
|
Furnishing all labor, equipment, materials and supervision for a citywide sewer collection system rehabilitation and inflow and infiltration reduction project. Efforts shall include several types of non-excavation rehabilitation, environmentally friendly techniques to obtain a I/I reduction goal of 75% from current peak wet weather flows. The work will include grouting, rehabilitation and repair techniques including; UV cured CIPP lining, chemical point repair grouting,T-liner or Top Hat main to lateral connections, manhole rehabilitation using approved coating/lining products, chimney and rubber seal installations, manhole lid plugs, and post rehabilitation CCTV inspection for effectiveness and warrantee. Minor excavation for 3 lateral/main connections will be required under archaeological monitoring supervision. Provide bypass pumping as required. The rehabilitation efforts are time sensitive and must be completed before rainy season 2023. CCTV post inspect shall occur after a substantial rain event late 2023 or early 2024. Condition reports and CCTV video shall be available for review. Mapping and rehab evaluation GIS shape files are available as well as condition assessment rating sheets for sewer mains, laterals and manholes.
|
|
NIGP Code:
|
578-97
Water, Non-Potable
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|