Bid Solicitation: S-44300-00007998
|
Responses Due in 7 Days, 21 Hours, 57 Minutes
|
Header Information
|
Bid Number:
|
S-44300-00007998
|
Description:
|
Pendleton Cottage 2475 and 2543 Siding Replacement Eastern Oregon Training Center (EOTC)
|
Bid Opening Date:
|
09/28/2023 03:00:00 PM
|
Purchaser:
|
Terri Ruddell
|
Organization:
|
Oregon Health Authority
|
Department:
|
44330 - Oregon State Hospital
|
Location:
|
00450 - OSH Pendleton
|
Fiscal Year:
|
23
|
Type Code:
|
|
Allow Electronic Quote:
|
Yes
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
08/31/2023 04:00:00 PM
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
A mandatory Prebid conference will be held on September 14, 2023, 1:00PM (Pacific) located at located at 2537 Westgate Pendleton OR 97801. Please confirm participation with the SPC listed on page 1 by email.
|
Bulletin Desc:
|
1. Removal and disposal of existing siding and trim of cottages 2475 and 2543
2. Preparation and installation of new vapor barrier.
3. Installation of fiber cement siding, caulk, trim and paint.
|
|
Ship-to Address:
|
|
Bill-to Address:
|
|
Print Format:
|
|
File Attachments:
|
Addenda #1 ITB 5626
5626 Addendum 2.pdf
Attachment B-2 Plans Cottage 2543
S-44300-00007998 ITB 5626
Attachment A Specifications - SOW
Attachment B Plans - Cottage 2475
Attachment C Federal Terms and Conditions
Exhibit 1 Bid Submittal Form
Exhibit 2 Bid Security
Exhibit 3 Performance Bond
Exhibit 4 Payment Bond Form
Exhibit 5 Sample Agreement
Exhibit 6 General Conditions
Exhibit 7 Supplemental General Conditions
Exhibit 8 Contract Closeout Checklist
|
Form Attachments:
|
|
Required Quote Attachments
|
|
Discipline Type:
|
Public Improvement
|
Procurement Method:
|
Intermediate Procurement
|
Amendments:
|
Amendment #
|
Amendment Date
|
Amendment Note
|
1
|
09/05/2023 02:47:59 PM
|
Attachment File Changes: Header 1. File 'Addenda #1 ITB 5626': File 'Addenda #1 ITB 5626' added .
|
2
|
09/20/2023 01:53:23 PM
|
Header 1. Bid Opening Date changed from "09/21/2023 03:00:00 PM" to "09/28/2023 03:00:00 PM". 2. Bulletin Desc changed from "1. Removal and disposal of existing siding and trim of cottage 2475.
2. Preparation and installation of new vapor barrier.
3. Installation of fiber cement siding, caulk, trim and paint." to "1. Removal and disposal of existing siding and trim of cottages 2475 and 2543
2. Preparation and installation of new vapor barrier.
3. Installation of fiber cement siding, caulk, trim and paint.". 3. Pre-Bid Conference changed from "A mandatory pre-bid conference will be held on September 14, 2023, 1:00PM (Pacific) located at located at 2537 Westgate Pendleton OR 97801. Please confirm participation with the SPC listed on page 1 by email." to "A mandatory Prebid conference will be held on September 14, 2023, 1:00PM (Pacific) located at located at 2537 Westgate Pendleton OR 97801. Please confirm participation with the SPC listed on page 1 by email.". 4. Description changed from "Pendleton Cottage 2475 Siding Replacement Eastern Oregon Training Center (EOTC)" to "Pendleton Cottage 2475 and 2543 Siding Replacement Eastern Oregon Training Center (EOTC)". Attachment File Changes: Header 1. File '5626 Addendum 2.pdf': File '5626 Addendum 2.pdf' added . 2. File 'Attachment B-2 Plans Cottage 2543': File 'Attachment B-2 Plans Cottage 2543' added .
|
|
|
Item # 1:
(
910
-
52
)
|
The scope of the Project includes but may not be limited to the following:
Removal and disposal of existing siding and trim of cottage 2475.
Preparation and installation of new vapor barrier.
Installation of fiber cement siding, caulk, trim and paint.
|
|
NIGP Code:
|
910-52
Maintenance and Repair Services, Building (Not Otherwise Classified)
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|