Bid Solicitation: S-73000-00006447
|
Responses Due in 14 Days, 21 Hours, 36 Minutes
|
Header Information
|
Bid Number:
|
S-73000-00006447
|
Description:
|
I-5: MP 127.0 to MP 136.2 Drainage Correction Project
|
Bid Opening Date:
|
04/25/2023 03:00:00 PM
|
Purchaser:
|
Terri Sinclair-Olson
|
Organization:
|
Department of Transportation
|
Department:
|
7304230 - Region 3
|
Location:
|
32001 - District 7 ADM/District 7 Manager - Epps
|
Fiscal Year:
|
23
|
Type Code:
|
|
Allow Electronic Quote:
|
Yes
|
Alternate Id:
|
|
Required Date:
|
04/07/2023
|
Available Date
:
|
04/10/2023 09:50:27 AM
|
Info Contact:
|
Terri.sinclair-olson@odot.oregon.gov 541-530-9480
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Blanket
|
Blanket/Contract Begin Date:
|
05/01/2023
|
Blanket/Contract End Date:
|
06/30/2023
|
Pre Bid Conference:
|
None
|
Bulletin Desc:
|
Complete roadwork and drainage modifications to provide positive drainage along Interstate 5, between mile points 127.0 and 136.2, in Douglas County, OR. The Work requires Work Zone Traffic Control.
|
|
Ship-to Address:
|
Region 3
3500 NW Stewart Parkway
Roseburg, OR 97470
US
Email: ODOT.OregonBuys@odot.state.or.us
Phone: (541)957-3500
|
Bill-to Address:
|
Region 3
3500 NW Stewart Parkway
Roseburg, OR 97470
US
Email: ODOT.OregonBuys@odot.state.or.us
Phone: (541)957-3500
|
Print Format:
|
Bid Print New
|
File Attachments:
|
ATT A Special Provisions and Specifications~8.pdf
ATT B Plans~3.pdf
35627 ITB.docx
|
Form Attachments:
|
|
Required Quote Attachments
|
|
Discipline Type:
|
Public Improvement
|
Procurement Method:
|
Competitive Sealed Bid
|
|
Item # 1:
(
913
-
71
)
|
Mobilization
|
|
NIGP Code:
|
913-71
Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc)
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
LUMP SUM - Lump Sum
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 2:
(
913
-
71
)
|
Temporary Workzone Traffic Control, Complete
|
|
NIGP Code:
|
913-71
Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc)
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
LUMP SUM - Lump Sum
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 3:
(
913
-
71
)
|
Erosion Control
|
|
NIGP Code:
|
913-71
Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc)
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
LUMP SUM - Lump Sum
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 4:
(
913
-
71
)
|
Pollution Control Plan
|
|
NIGP Code:
|
913-71
Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc)
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
LUMP SUM - Lump Sum
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 5:
(
913
-
71
)
|
Sawed Transverse Grooves
|
|
NIGP Code:
|
913-71
Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc)
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
3,550.0
|
|
FOOT/FEET - Foot/Feet
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|
|