The Dalles Unwatering Pump Pipe Rehab
Agency: | DEPT OF DEFENSE |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159747691439509 |
Posted Date: | Nov 16, 2021 |
Due Date: | Nov 30, 2022 |
Solicitation No: | W9127N22R0010 |
Source: | https://sam.gov/opp/c1ca63bf74... |
- Contract Opportunity Type: Solicitation (Original)
- All Dates/Times are: (UTC-05:00) EASTERN STANDARD TIME, NEW YORK, USA
- Original Published Date: Nov 16, 2021 12:30 pm EST
- Original Date Offers Due: Nov 30, 2022 12:00 am EST
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Dec 15, 2022
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 4710 - PIPE, TUBE AND RIGID TUBING
- NAICS Code: 332996 - Fabricated Pipe and Pipe Fitting Manufacturing
-
Place of Performance:
The Dalles , OR 97058USA
Navigation Lock Unwatering Pumps Rebuild Requirements
Drawings:
Attachment 1: Navlock Unwatering Assembly Prelim drawing is for general pump overview and
if for information only.
Attachment 2: As-built drawing, DDN-20928-69-15, is only for reference. All dimensions are to
be pulled from the NL Unwatering Pump Assembly and NAVLOCK UNWATERING PUMP
ASSEMBLY - TYPICAL FLANGE drawing.
Attachment 3: NL Unwatering Pump Assembly hand sketch drawing provides assembly
dimensions and layout.
Attachment 4: NAVLOCK UNWATERING PUMP ASSEMBLY - TYPICAL FLANGE drawing provides
the layout and dimensions for to match bolt patterns for pump and discharge casing flange.
The Contractor shall field verify all measurements and layout prior to starting fabrication.
All provided quantities below are per pump. There are two pumps. Contractor to provide material for
two pump systems as described.
1. Pump shaft
a. Refer to Attachment 3 NL Unwater Pump Assembly Drawing for dimensions.
b. Refer to DDN-20928-69-15 for overall layout.
c. Material: 416 SS and pump shaft quality.
d. Three sections per pump @ 9’-11 ¾.
e. 2-7/16" x 9' 1-3/4" Headshaft: One section per pump @ 9’-1 ¾ . Contractor to provide
shaft adjusting nut that matches thread pitch for the Jump Coupling on the 2 7/16 side
of the shaft. Government will cut threads and keyway on motor adjustment end.
f. Thread length is to accommodate 2-3/16" Standard Shaft Couplings.
g. Acceptable runout: 2 Thou per foot
2. Casing
a. 18" x 9' 11-3/4" Flanged Columns Coated OD & ID
b. Refer to Attachment 4 NAVLOCK UNWATERING PUMP ASSEMBLY - TYPICAL FLANGE
drawing for layout and dimensions for to match bolt patterns for pump and discharge
casing flange.
c. 3 sections per pump @ 9’-11 ¾,
d. Material: Steel meeting pump industry standards.
e. Coating is the be epoxy to prevent erosion and corrosion. Coating to be applied inside
and outside.
3. Shaft couplers
a. Refer to Attachment 3 NL Unwater Pump Assembly Drawing for sketch of location on
assembly.
b. Three 2-3/16" Standard Shaft Couplings
c. One 2-3/16" x 2-7/16" Jump Coupling (aka Reducer
Coupler)
d. Match shaft threads
4. Bearing Retainer (aka Spiders) with rubber bearing insert, Open Line Shaft
a. Sandwiched between casing sections as shown in example Figure 1.
b. Complete bearing assembly including rubber bearing and keepers.
c. Material: Bearing Retainer is to be Bronze; the rubber bearing is to have properties like
Nitrile Butadiene Rubber (NBR)
Figure 1 Desired Retainer Bearing Configuration
- KO CONTRACTING DIVISION 333 SW FIRST AVE
- PORTLAND , OR 97204-3495
- USA
- Derek Caputi
- derek.caputi@usace.army.mil
- Phone Number 5038084619
- Nov 16, 2021 12:30 pm ESTSolicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.