Oregon Bids > Bid Detail

2022 Street Maintenance: Curb Ramps and Pedestrian Improvements

Agency: Wilsonville
Level of Government: State & Local
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
  • Y - Construction of Structures and Facilities
Opps ID: NBD15700531492324434
Posted Date: Nov 16, 2022
Due Date: Dec 14, 2022
Source: https://www.ci.wilsonville.or....
2022 Street Maintenance: Curb Ramps and Pedestrian Improvements
Bid/RFP Status:
Open - accepting bids and proposals
Bid/RFP Due Date:
Wednesday, December 14, 2022 - 2:00pm
Quest CDN Reference Number:
8326901

Project consists of furnishing all materials, labor, equipment, and supervision for Schedule A: replacing ADA curb ramps and associated traffic signals at the intersection of Boones Ferry Road & Wilsonville Road, the intersection of Wilsonville Road & Rose Lane, and Schedule B: eight crosswalk improvements on French Prairie Drive, along with the performance of such additional and incidental work as called for by the Specifications and Contract Documents. The Schedule A improvements include placement of approximately 12 TONS of asphalt concrete pavement, 385 LF of curb or curb and gutter, 1395 SF of concrete sidewalk/ramp reconstruction, and various pedestrian signal improvements. The Schedule B improvements include placement of approximately 1,860 SF of thermoplastic pavement bar and installation or reinstallation of 74 permanent signs.Project consists of furnishing all materials, labor, equipment, and supervision for Schedule A: replacing ADA curb ramps and associated traffic signals at the intersection of Boones Ferry Road & Wilsonville Road, the intersection of Wilsonville Road & Rose Lane, and Schedule B: eight crosswalk improvements on French Prairie Drive, along with the performance of such additional and incidental work as called for by the Specifications and Contract Documents. The Schedule A improvements include placement of approximately 12 TONS of asphalt concrete pavement, 385 LF of curb or curb and gutter, 1395 SF of concrete sidewalk/ramp reconstruction, and various pedestrian signal improvements. The Schedule B improvements include placement of approximately 1,860 SF of thermoplastic pavement bar and installation or reinstallation of 74 permanent signs.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >