Bid Solicitation: S-KE0010-00005851
|
Responses Due in 3 Days, 22 Hours, 35 Minutes
|
Header Information
|
Bid Number:
|
S-KE0010-00005851
|
Description:
|
RFQ 2023200054 Arc Flash Study, Incident Energy Analysis and Short Circuit Study
|
Bid Opening Date:
|
03/13/2023 05:00:00 PM
|
Purchaser:
|
Dori Palmer
|
Organization:
|
City of Eugene
|
Department:
|
KE001003 - Wastewater
|
Location:
|
KE001 - Wastewater
|
Fiscal Year:
|
23
|
Type Code:
|
|
Allow Electronic Quote:
|
No
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
02/17/2023 09:30:20 AM
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
An optional pre-closing site visit will be offered upon request.
|
Bulletin Desc:
|
In general, work includes performing an Arc Flash Study, Incident Energy Analysis and Short Circuit Study on all electrical equipment rated 50V or above on the 92-acre Regional Wastewater Treatment Facility at 410 River Avenue Eugene, Oregon and at 3050 Goodpasture Lakes Loop, Eugene, OR 97401 in accordance with OSHA 29 CFR 1910 and NFPA 70E
|
|
Ship-to Address:
|
Dori Palmer
410 River Avenue
Eugene
OR
US
97404, OR 97404
US
Email: dpalmer@eugene-or.gov
Phone: (541)682-8643
|
Bill-to Address:
|
Dori Palmer
410 River Avenue
Eugene
OR
US
97404, OR 97404
US
Email: dpalmer@eugene-or.gov
Phone: (541)682-8643
|
Print Format:
|
Bid Print New
|
File Attachments:
|
2023200054_A2_Addendum_3
2023200054_A2_Addendum_4
2023200054_SKM Model Data
2023200054_A1_Arc Flash Study, Incident Energy Analysis and Short Circuit Study
2023200054_A1_Attachment A_MWMC SHORT CIRCUIT ANALYSIS ONE-LINE-Model
2023200054_A1_Attachment B_One Line Drawings
2023200054_A1_Attachment C_Lab Panel Schedules
2023200054_A2_Addendum_1
2023200054_A2_Addendum_2
|
Form Attachments:
|
|
Required Quote Attachments
|
|
Discipline Type:
|
A and E Related Services
|
Procurement Method:
|
Intermediate Procurement
|
Amendments:
|
Amendment #
|
Amendment Date
|
Amendment Note
|
1
|
02/24/2023 07:53:46 AM
|
Addendum No. 1 Amends/clarifies and includes additional drawings Attachment File Changes: Header 1. File '2023200054_A2_Addendum_1': File '2023200054_A2_Addendum_1' added .
|
2
|
02/28/2023 06:45:40 AM
|
Addendum No.2 added. Answers to additional questions. Attachment File Changes: Header 1. File '2023200054_A2_Addendum_2': File '2023200054_A2_Addendum_2' added .
|
3
|
03/02/2023 12:50:29 PM
|
Addendum No. 3 Adds that dates are flexible and replaces sample contract. Attachment File Changes: Header 1. File '2023200054_A2_Addendum_3': File '2023200054_A2_Addendum_3' added .
|
4
|
03/09/2023 06:56:37 AM
|
Addendum No. 4 Extends Closing Due Date and Time to Monday, March 13, 2023pm PST and adds SKM model data. Header 1. Bid Opening Date changed from "03/09/2023 05:00:00 PM" to "03/13/2023 05:00:00 PM". Attachment File Changes: Header 1. File '2023200054_A2_Addendum_4': File '2023200054_A2_Addendum_4' added . 2. File '2023200054_SKM Model Data': File '2023200054_SKM Model Data' added .
|
|
|
Item # 1:
(
925
-
31
)
|
Arc Flash Study, Incident Energy Analysis and Short Circuit Study on all electrical equipment rated 50V or above on the 92-acre Regional Wastewater Treatment Facility at 410 River Avenue Eugene, Oregon and at 3050 Goodpasture Lakes Loop, Eugene, OR 97401 in accordance with OSHA 29 CFR 1910 and NFPA 70E..
|
|
NIGP Code:
|
925-31
Electrical Engineering (Incl. Cogeneration Design Services)
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
LUMP SUM - Lump Sum
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|